Index
Information
Product : Joshua Tree,
Code Name : VP3350, PDS
Firmware Platform : NEO 3.0, Nuttx-base
Test Software Running Environment : Windows 10/11+, .Net Framework 4.7.2+
Test Stages Flow
Test Station/Stage Flow
- step 01 - Board-Level Test.
UTS Run Mode = Board-Level Run Mode
- step 02 - Assembly Production Test.
UTS Run Mode = TM / Production / Assembly - step 03 - PKI Process (PKI001,PKI002,PKI003), Certificates & Keys Installation.
- step 04
UTS Run Mode = Configuration Mode
- EMV L2 Configuration, Jason Config File Installation (ViVOConfig.MFG Command Line Tool)
- Stand-alone, Non-PKI Infrastructure Certificates Installation (Ex: TransArmor Root-CA-Keys)
- ADF App Installation (ViVOConfig.MFG Command Line Tool)
- Others we may have in the future.
- step 05 - QA Test.
UTS Run Mode = QC
- For Demo P/N, Keys Check with DEK part.
- For Production P/Ns, Keys Check without DEK part.
- *step 06 - QA-US Test. Optional
UTS Run Mode = QC-US.
QC Mode Test always be w/ DEK Check.
(after TG3 Secure Room/HSM/Online PKI Stations)
Objective: Cypress sometimes perform DEK injection in Production Units then run QC-US mode for this scenario test.
80178001-TIVersion | Date | Comment |
---|---|---|
RevB.docx (Editable)*RevB_Signed.pdf (Signed) | ==[Major Updates]== 1.BT Fixture Firmware Update – See Appendix D, New Test Method by Fixture FW Version + new VP3350 Firmware 2.Use New ICC Item, 80005217-001 Rev. A, ICC+Dual MSR Cards 3.Figures Updated – CTLS Test – A Type. | |
RevA.pdf | Editable Word Version | |
| ||
| Initial Version |
Test Accessories List
Item/Version | Comment |
---|---|
Notes / V01 | Image List |
iOS Test AppiPhone | For iPhone, VP3350 CFG Type B |
iOS Test App.iPad | For iPad, CFG Type F |